Aerospace Testing InternationalAerospace Testing International
  • News
    • A-E
      • Acoustic & Vibration
      • Avionics
      • Data Acquisition
      • Defense
      • Drones & Air Taxis
      • Electric & Hybrid
      • EMC
      • Engine Testing
      • Environmental Testing
    • F-L
      • Fatigue Testing
      • Flight Testing
      • Helicopters & Rotorcraft
      • High Speed Imaging
      • Industry News
    • M-S
      • Materials Testing
      • NDT
      • Simulation & Training
      • Software
      • Space
      • Structural Testing
      • Supplier News
    • T-Z
      • Technology
      • Telemetry & Communications
      • Weapons Testing
      • Wind Tunnels
  • Features
  • Magazines
    • March 2025
    • Dec 2024/Jan 2025
    • Showcase 2025
    • September 2024
    • June 2024
    • Archive Issues
    • Subscribe Free!
  • Opinion
  • Webinars
  • Events
    • All Events
    • Aerospace Test & Development Show
  • Podcasts
  • Videos
  • Suppliers
    • Supplier Spotlights
    • Press Releases
    • Technical Papers
  • Jobs
    • Browse Jobs
    • Post a Job – It’s FREE!
    • Manage Jobs (Employers)
LinkedIn YouTube X (Twitter)
LinkedIn YouTube X (Twitter)
Subscribe to magazine Subscribe to email newsletter Media Pack
Aerospace Testing InternationalAerospace Testing International
  • News
      • Acoustic & Vibration
      • Avionics
      • Data Acquisition
      • Defense
      • Drones & Air Taxis
      • Electric & Hybrid
      • EMC
      • Engine Testing
      • Environmental Testing
      • Fatigue Testing
      • Flight Testing
      • Helicopters & Rotorcraft
      • High Speed Imaging
      • Industry News
      • Materials Testing
      • NDT
      • Simulation & Training
      • Software
      • Space
      • Structural Testing
      • Supplier News
      • Technology
      • Telemetry & Communications
      • Weapons Testing
      • Wind Tunnels
  • Features
  • Magazines
    1. March 2025
    2. Dec 2024/Jan 2025
    3. Showcase 2025
    4. September 2024
    5. June 2024
    6. March 2024
    7. Archive Issues
    8. Subscribe Free!
    Featured
    19th March 2025

    In this issue: March 2025

    Online Magazines By Ben Sampson
    Recent

    In this issue: March 2025

    19th March 2025
    contents and front cover of magazine

    In this issue: December / January 2025

    19th December 2024
    Showcase 2025

    In this issue – Showcase 2025

    6th November 2024
  • Opinion
  • Webinars
  • Events
    • All Events
    • Aerospace Test & Development Show
  • Podcasts
  • Videos
  • Suppliers
    • Supplier Spotlights
    • Press Releases
    • Technical Papers
  • Jobs
    • Browse Jobs
    • Post a Job – It’s FREE!
    • Manage Jobs (Employers)
LinkedIn YouTube X (Twitter)
Aerospace Testing InternationalAerospace Testing International
News Space

Orion Artemis II Moon spacecraft completes testing

Ben SampsonBy Ben Sampson2nd May 20253 Mins Read
Share LinkedIn Twitter Facebook Email
The Artemis II Orion spacecraft in the Neil A. Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida in preparation for the installation of three spacecraft adapter jettison fairings during March, 2025 (Image:

Engineers at Lockheed Martin completed assembly and testing of the Orion Artemis II spacecraft for NASA this week.

Orion will transport astronauts to the Moon for the first time in more than 50 years, although they will not land.

Scheduled to launch in early 2026, Artemis II and the Orion spacecraft will travel for 10-days. The trip will take NASA astronauts Reid Wiseman, Victor Glover, Christina Koch and Canadian astronaut Jeremy Hansen. 4,600 miles (7,400km) beyond the Moon and back to Earth.

According to Lockheed, which built Orion’s crew module, module adaptor and launch abort system, it is the most advanced, human-rated, deep space spacecraft ever built.

Kirk Shireman, vice president of Human Space Exploration and Orion program manager at Lockheed Martin said, “The Orion spacecraft completion for Artemis II is a major step forward in efforts to develop a long-term lunar presence. It’s exciting to think that soon, humans will see the Earth rise over the lunar horizon from our vehicle, while also traveling farther from Earth than ever before.”

Orion upgrades

The uncrewed EFT-1 and Artemis I test flights were the first steps in validating the spacecraft’s core systems. Artemis II will put Orion through its final tests in deep space with a crew on board and will include learnings and significant enhancements gleaned from the Artemis I mission.

To support the health and safety of the crew, new systems have been added, which include life support – air, water, thermal control, waste management – displays and controls, audio communications, an exercise machine and a fully functional Launch Abort System. Additionally, the vehicle is outfitted with a subset of docking sensors and an experimental laser communication system, enabling high data-rate communications and paving the way for future missions.

Launch preparations

NASA’s Exploration Ground Systems (EGS) team will now perform the final preparations for launch. The spacecraft will be moved to NASA’s Kennedy Space Center where it will be loaded with propellants and other consumables such as water and oxygen, and the launch abort system and its protective fairings will be installed.

When these preparations are completed it will then be transported to the Vehicle Assembly Building, lifted onto the Space Launch System (SLS) rocket and undergo pre-launch preparations.

Artemis II mission aims

During the mission, the crew will evaluate the spacecraft’s performance, test its navigation and communication systems, and conduct scientific experiments. They will also perform a rendezvous operation with the SLS upper stage, practice the docking activities needed for future missions, including Artemis III – the mission which will be the first human lunar landing since Apollo 17 in 1972.

With Orion for Artemis II is completed, Lockheed Martin is building the Orion spacecraft needed for future Artemis missions. Artemis III and IV vehicles are in the Operations and Checkout Building, while the pressure vessel is being welded at NASA’s Michoud Facility in New Orleans.

Lockheed Martin is contracted to develop Orion spacecraft up to Artemis VIII.

Share. Twitter LinkedIn Facebook Email
Previous ArticleAurora SPRINT X-plane completes wind tunnel tests
Next Article Emerson unveils AI-powered test and measurement tools
Ben Sampson

Ben has worked as a journalist and editor, covering technology, engineering and industry for the last 20 years. Initially writing about subjects from nuclear submarines to autonomous cars to future design and manufacturing technologies, he was editor of a leading UK-based engineering magazine before becoming editor of Aerospace Testing in 2017.

Related Posts

News

Astrolight raises €2.8m to build optical space communications network

22nd May 20253 Mins Read
Drones & Air Taxis

Wisk and NASA to partner on US autonomous flight operations and standards

20th May 20252 Mins Read
Industry News

Society of Flight Test Engineers Europe releases Annual Symposium 2025 agenda

19th May 20252 Mins Read
Latest Posts

dSPACE expands Scalexio platform for HIL testing

23rd May 2025

AIR cargo eVTOL completes night flight testing

22nd May 2025

Astrolight raises €2.8m to build optical space communications network

22nd May 2025
Supplier Spotlights
Our Social Channels
  • Twitter
  • YouTube
  • LinkedIn
Getting in Touch
  • Subscribe To Magazine
  • Contact Us
  • Meet the Team
  • Media Pack
Related Topics
  • Aircraft Interiors
  • Business Jet Interiors
FREE WEEKLY NEWS EMAIL!

Get the 'best of the week' from this website direct to your inbox every Wednesday

© 2023 Mark Allen Group Ltd | All Rights Reserved
  • Cookie Policy
  • Privacy Policy
  • Terms & Conditions

Type above and press Enter to search. Press Esc to cancel.