Aerospace Testing InternationalAerospace Testing International
  • News
    • A-E
      • Acoustic & Vibration
      • Avionics
      • Data Acquisition
      • Defense
      • Drones & Air Taxis
      • Electric & Hybrid
      • EMC
      • Engine Testing
      • Environmental Testing
    • F-L
      • Fatigue Testing
      • Flight Testing
      • Helicopters & Rotorcraft
      • High Speed Imaging
      • Industry News
    • M-S
      • Materials Testing
      • NDT
      • Simulation & Training
      • Software
      • Space
      • Structural Testing
      • Supplier News
    • T-Z
      • Technology
      • Telemetry & Communications
      • Weapons Testing
      • Wind Tunnels
  • Features
  • Magazines
    • June 2025
    • March 2025
    • Dec 2024/Jan 2025
    • Showcase 2025
    • September 2024
    • Archive Issues
    • Subscribe Free!
  • Opinion
  • Webinars
  • Events
    • All Events
    • Aerospace Test & Development Show
  • Podcasts
  • Videos
  • Suppliers
    • Supplier Spotlights
    • Press Releases
    • Technical Papers
  • Jobs
    • Browse Jobs
    • Post a Job – It’s FREE!
    • Manage Jobs (Employers)
LinkedIn YouTube X (Twitter)
LinkedIn YouTube X (Twitter)
Subscribe to magazine Subscribe to email newsletter Media Pack
Aerospace Testing InternationalAerospace Testing International
  • News
      • Acoustic & Vibration
      • Avionics
      • Data Acquisition
      • Defense
      • Drones & Air Taxis
      • Electric & Hybrid
      • EMC
      • Engine Testing
      • Environmental Testing
      • Fatigue Testing
      • Flight Testing
      • Helicopters & Rotorcraft
      • High Speed Imaging
      • Industry News
      • Materials Testing
      • NDT
      • Simulation & Training
      • Software
      • Space
      • Structural Testing
      • Supplier News
      • Technology
      • Telemetry & Communications
      • Weapons Testing
      • Wind Tunnels
  • Features
  • Magazines
    1. June 2025
    2. March 2025
    3. Dec 2024/Jan 2025
    4. Showcase 2025
    5. September 2024
    6. June 2024
    7. Archive Issues
    8. Subscribe Free!
    Featured
    11th June 2025

    In this issue: June 2025

    Online Magazines By Ben Sampson
    Recent

    In this issue: June 2025

    11th June 2025

    In this issue: March 2025

    19th March 2025
    contents and front cover of magazine

    In this issue: December / January 2025

    19th December 2024
  • Opinion
  • Webinars
  • Events
    • All Events
    • Aerospace Test & Development Show
  • Podcasts
  • Videos
  • Suppliers
    • Supplier Spotlights
    • Press Releases
    • Technical Papers
  • Jobs
    • Browse Jobs
    • Post a Job – It’s FREE!
    • Manage Jobs (Employers)
LinkedIn YouTube X (Twitter)
Aerospace Testing InternationalAerospace Testing International
Opinion

The 737 MAX is ready to fly again, but plane certification still needs to be fixed – here’s how

Opinion WritersBy Opinion Writers5th October 20206 Mins Read
Share LinkedIn Twitter Facebook Email
737 Max
The Boeing 737 MAX is expected to take to the skies again following a review of the MCAS system which was responsible for two crashes in 2019 (Image: Jason Redmond / Getty Images)

by Ronnie R. Gipson Jr., University of Memphis, USA

After being grounded in March 2019 following two fatal crashes, the Boeing 737 MAX is expected to be certified by the Federal Aviation Administration to fly again later this fall. Investigations pointed to a problem with the aircraft’s Maneuvering Characteristics Augmentation System, or MCAS. This automated control system was designed to stabilize the plane and compensate for the more powerful engines used on the 737 MAX compared to previous versions.

The FAA’s certification of the plane has come under fire because manufacturers can speed up the process by having only enhancements to a preapproved aircraft reviewed and certified. Ronnie R. Gipson Jr., an expert in aviation law and visiting professor at the University of Memphis Cecil C. Humphreys School of Law, whose work was cited in the House Committee on transportation and infrastructure’s report on this issue, explains what happened and ways to improve these safety regulations.

What are the criticisms of the FAA certification process stemming from the 737 MAX crashes?

The process for the certification of a transport category aircraft is a very involved and costly process. The aircraft manufacturers that go down this path have to be committed to spending hundreds of millions of dollars. It starts with an initial design, and the aircraft that is produced is then subjected to dynamic flight testing for compliance with all of the Federal Aviation Administration regulations. Once the airplane satisfies all those requirements, the aircraft is given an original type certificate by the FAA. The aircraft manufacturer is then allowed to produce aircraft and sell them.

As time goes on, technology advances and the manufacturer identifies ways to improve on that original design. So the manufacturer goes back to the FAA and says, “We want to take this initial design that we have and amend it because we made some changes.” At this point, the aircraft manufacturer files what’s called an amended type certificate application for a derivative aircraft from the baseline aircraft. For example, the original type certificate for the first 737 design was submitted to the FAA in 1967. That original design has had multiple derivative aircraft approved by the FAA, with the 737 MAX being the 13th version.

a timeline showing the certification approval dates and models of the original 737 design and its derivatives.
Certification timeline of the Boeing 737 series of aircraft. (Image: US Department of Transportation, Office of Inspector General)

In the amended type certification process, the regulatory authority focuses only on what’s changed. Another thing to keep in mind is that the FAA just doesn’t have the manpower to oversee all the tests that go with an amended type certificate approval. Therefore, the FAA reviews most of the critical changes related to safety and delegates the noncritical changes for review to the manufacturers – in this case to a body in Boeing which consists essentially of Boeing employees.

And that’s what happened here. MCAS wasn’t necessarily presented as a change in the design impacting control in flight. As a result, the MCAS was not a priority for the FAA in the amended certificate approval process. The MCAS capabilities and what it was supposed to control were never fully revealed. That’s really where the problem started. It was with the narrative that was being presented to the FAA, and the lack of oversight in the amended type certificate process. The result was that the MCAS system that was initially presented to the FAA at the beginning of the amended type certificate process was not the same system that ended up in the aircraft.

A diagram showing how the MCAS system forces the nose of the aircraft downwards.
A diagram showing how the MCAS system forces the nose of the aircraft downwards. (Image: US Department of Transportation, Office of Inspector General)

How will the recent recertification for the 737 MAX ensure that the model is now safe?

The FAA has had to backtrack and give the MCAS system the intense level of scrutiny that it deserved. The FAA has required the manufacturer to go back and make significant adjustments to the software, in addition to changes to the operator’s manual, which is what the pilots would see.

How can the certification process be improved?

I see two paths to take. First, for a transport category aircraft, regulations are changed so that the manufacturer can receive amended type certificates for only 20 years after the original type certificate has been issued by the FAA.

Here’s how that would work: An aircraft manufacturer designs an aircraft for certification in the transport category and applies for the original type certificate in 2020. Once the original type certification is awarded in, say, 2025, then the manufacturer should have 20 years. That means that the manufacturer would have until the year 2045 to seek an amendment to that original type certificate. Beginning in 2046, if the aircraft manufacturer wants to make subsequent design changes, they have to start over and get a new original type certificate.

The second component to resolving this problem would be to step in and review what areas the FAA can delegate oversight authority for system changes in an amended aircraft certification application review.

What are the obstacles to making these changes?

One would be money. The FAA has a budget, and these are very costly measures because the FAA will need more engineers and administrators. And for that to happen, Congress has to be prepared to spend the money to make that happen by increasing the FAA’s budget.

There’s also going to be a cost to the industry. Implementing the proposal of a 20-year cap on the validity of that original type certificate is going to impose a greater financial cost on the aircraft manufacturers of transport category aircraft. They’re not going to have as much time to get a return on their investment for the aircraft that they produce. So the aircraft are going to end up costing more, which means the airlines are going to end up paying more for those planes. And that cost is going to trickle down to the flying public in those seats.

Ronnie R. Gipson Jr.,  is visiting Assistant Professor of Law, University of Memphis, USA

This article is republished from The Conversation under a Creative Commons license. Read the original article.

Share. Twitter LinkedIn Facebook Email
Previous ArticleUK test site to run trials of unmanned drone traffic management system
Next Article Aerospace Corporation breaks ground on space warfare R&D center
Opinion Writers

Related Posts

Prof. Dr. Nicolas Noiray Associate Professor at the Department of Mechanical and Process Engineering Deputy head of Inst. Energy and Process Engineering
Engine Testing

Academic Insight: Fixing the thermoacoustic instabilities of hydrogen combustion

3rd June 20253 Mins Read
Opinion

Golden Dome: An explanation of the proposed US missile defense system

28th May 20257 Mins Read
Materials Testing

Giving green thrusters a boost

15th April 20256 Mins Read
Latest Posts

In this issue: June 2025

11th June 2025
Gray Saab Gripen E fighter aircraft in flight against cloudy sky background with visible afterburner

Saab achieves AI milestone with Gripen E fighter jet

11th June 2025
Large blue industrial testing frame with green monitoring display screens in aerospace structural testing laboratory

SwRI wins US$250m deal to sustain aging US military aircraft

10th June 2025
Supplier Spotlights
Our Social Channels
  • Twitter
  • YouTube
  • LinkedIn
Getting in Touch
  • Subscribe To Magazine
  • Contact Us
  • Meet the Team
  • Media Pack
Related Topics
  • Aircraft Interiors
  • Business Jet Interiors
FREE WEEKLY NEWS EMAIL!

Get the 'best of the week' from this website direct to your inbox every Wednesday

© 2023 Mark Allen Group Ltd | All Rights Reserved
  • Cookie Policy
  • Privacy Policy
  • Terms & Conditions

Type above and press Enter to search. Press Esc to cancel.