Aerospace Testing InternationalAerospace Testing International
  • News
    • A-E
      • Acoustic & Vibration
      • Avionics
      • Data Acquisition
      • Defense
      • Drones & Air Taxis
      • Electric & Hybrid
      • EMC
      • Engine Testing
      • Environmental Testing
    • F-L
      • Fatigue Testing
      • Flight Testing
      • Helicopters & Rotorcraft
      • High Speed Imaging
      • Industry News
    • M-S
      • Materials Testing
      • NDT
      • Simulation & Training
      • Software
      • Space
      • Structural Testing
      • Supplier News
    • T-Z
      • Technology
      • Telemetry & Communications
      • Weapons Testing
      • Wind Tunnels
  • Features
  • Magazines
    • March 2025
    • Dec 2024/Jan 2025
    • Showcase 2025
    • September 2024
    • June 2024
    • Archive Issues
    • Subscribe Free!
  • Opinion
  • Webinars
  • Events
    • All Events
    • Aerospace Test & Development Show
  • Podcasts
  • Videos
  • Suppliers
    • Supplier Spotlights
    • Press Releases
    • Technical Papers
  • Jobs
    • Browse Jobs
    • Post a Job – It’s FREE!
    • Manage Jobs (Employers)
LinkedIn YouTube X (Twitter)
LinkedIn YouTube X (Twitter)
Subscribe to magazine Subscribe to email newsletter Media Pack
Aerospace Testing InternationalAerospace Testing International
  • News
      • Acoustic & Vibration
      • Avionics
      • Data Acquisition
      • Defense
      • Drones & Air Taxis
      • Electric & Hybrid
      • EMC
      • Engine Testing
      • Environmental Testing
      • Fatigue Testing
      • Flight Testing
      • Helicopters & Rotorcraft
      • High Speed Imaging
      • Industry News
      • Materials Testing
      • NDT
      • Simulation & Training
      • Software
      • Space
      • Structural Testing
      • Supplier News
      • Technology
      • Telemetry & Communications
      • Weapons Testing
      • Wind Tunnels
  • Features
  • Magazines
    1. March 2025
    2. Dec 2024/Jan 2025
    3. Showcase 2025
    4. September 2024
    5. June 2024
    6. March 2024
    7. Archive Issues
    8. Subscribe Free!
    Featured
    19th March 2025

    In this issue: March 2025

    Online Magazines By Ben Sampson
    Recent

    In this issue: March 2025

    19th March 2025
    contents and front cover of magazine

    In this issue: December / January 2025

    19th December 2024
    Showcase 2025

    In this issue – Showcase 2025

    6th November 2024
  • Opinion
  • Webinars
  • Events
    • All Events
    • Aerospace Test & Development Show
  • Podcasts
  • Videos
  • Suppliers
    • Supplier Spotlights
    • Press Releases
    • Technical Papers
  • Jobs
    • Browse Jobs
    • Post a Job – It’s FREE!
    • Manage Jobs (Employers)
LinkedIn YouTube X (Twitter)
Aerospace Testing InternationalAerospace Testing International
Defense Technology

3D printed parts to help US Air Force laboratory deal with high demand

Ben SampsonBy Ben Sampson25th April 20182 Mins Read
Share LinkedIn Twitter Facebook Email

An arc heater unit at the High Temperature Laboratory at Arnold Air Force Base (Image: US Air Force photo/Deidre Ortiz)

3D printers are to be used to help the Arnold Engineering Development Center’s High Temperature Laboratory at Arnold Air Force Base, Tennessee, meet a continuously increasing workload.

The High Temperature Laboratory (HTL) houses three arc heater units – H1, H2 and H3 – that provide aerothermal simulation environments for high-speed vehicle materials and structures.

According to Jonathan Kodman, project engineer, the arc heaters are in “high demand”, recently reaching a record year of about 60 test runs. “We could potentially see close to 100 runs in the future,” he said.

Benjamin Weaver, Air Force project manager, said that the HTL test teams have been looking at ways to accommodate additional testing because of high demand. “A study was done to look at everything from the system, process and infrastructure, to see how we can improve our throughput to meet the upcoming requirements,” Weaver said.

Kodman led the study and wrote a report laying out the various options for improvement, the scope of that work, and cost estimates. One of those options was using a 3D printer to print parts for the arc heaters. Having the ability to instead 3D print these parts will allow for a much quicker turnaround for testing in the arc heaters.

“There’s definitely a cost saving associated with doing this,” Kodman added. “We don’t have to wait for the parts to be shipped in to us.”

The study showed another way to meet the increasing workload would be by improving data processing by moving the data out of the control room faster.

“The 4K video we take of the testing in the arc heaters has to be compressed down and now all this is done in the control room,” Kodman said. “We would like to move that process out of the control room so we can be prepping for the next test while we’re finishing up video processing.”

While these are only two of the items the study identified, Elijah Minter, the Mid-Pressure Arc Heater Project director, mentioned that these are “ideas that will provide immediate impact” and assist the facility in reaching future testing requirements.

April 24, 2018

Share. Twitter LinkedIn Facebook Email
Previous ArticleGerman researchers develop hybrid engine concept to halve fuel-burn
Next Article Airbus and partners commit to future laminar flow wing research
Ben Sampson

Ben has worked as a journalist and editor, covering technology, engineering and industry for the last 20 years. Initially writing about subjects from nuclear submarines to autonomous cars to future design and manufacturing technologies, he was editor of a leading UK-based engineering magazine before becoming editor of Aerospace Testing in 2017.

Related Posts

News

Commercial aircraft could deploy aerosols to cool planet

9th May 20253 Mins Read
Defense

T-7A Red Hawk completes successful Escape System Sled Test

8th May 20252 Mins Read
Defense

US military flies Talon-A reusable hypersonic test vehicle

6th May 20253 Mins Read
Latest Posts

Commercial aircraft could deploy aerosols to cool planet

9th May 2025

Boom picks Colorado for Symphony engine testing

8th May 2025

T-7A Red Hawk completes successful Escape System Sled Test

8th May 2025
Supplier Spotlights
Our Social Channels
  • Twitter
  • YouTube
  • LinkedIn
Getting in Touch
  • Subscribe To Magazine
  • Contact Us
  • Meet the Team
  • Media Pack
Related Topics
  • Aircraft Interiors
  • Business Jet Interiors
FREE WEEKLY NEWS EMAIL!

Get the 'best of the week' from this website direct to your inbox every Wednesday

© 2023 Mark Allen Group Ltd | All Rights Reserved
  • Cookie Policy
  • Privacy Policy
  • Terms & Conditions

Type above and press Enter to search. Press Esc to cancel.